Abstract

The base metal (BM) of the main circulation pipeline (MCP) of the unit 3 of the South Ukraine NPP, which has been in operation for 200 thousand hours, was investigated by direct methods. It is shown that the mechanical properties and structure of BM of the MCP after 200 thousand hours of operation satisfy the requirements of regulatory documentation for metal. A comparison of the test results of the BM in the initial state and after 100 and 200 thousand hours of operation was carried out. It is shown that in the process of operation there is a decrease in the rate of changes in the mechanical properties of BM, in particular, during the last 100 thousand hours of operation in comparison with the previous ones.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.