Abstract

Geosynthetic-reinforced soil (GRS) integral bridge was developed to overcome several inherent serious problems with conventional type bridges comprising a simple-supported girder (or multiple girders) supported via bearings typically by RC abutments retaining unreinforced backfill (and a pier or piers for multiple girders). The problems include: (a) relatively high construction and maintenance costs with relatively long construction time resulting from the use of bearings and massive abutment structures usually supported by piles; (b) bumps immediately behind the abutments; and (c) a relatively low stability of the girders supported by roller bearings and the approach embankment against seismic and tsunami loads. For a GRS integral bridge, a pair of GRS walls (and an intermediate pier or piers if necessary for a long span) are first constructed. After the deformation of the supporting ground and the backfill of the GRS walls has taken place sufficiently, steel-reinforced full-height-rigid (FHR) facings are constructed by casting-in-place concrete on the wall face wrapped-around with the geogrid reinforcement. Finally a continuous girder is constructed with both ends integrated to the top of the FHR facings. The girder is also connected to the top of an intermediate pier, or piers, if constructed. The background and history of the development of GRS integral bridge is described. The first four case histories, one completed in 2012 for a new high-speed train line and the other three completed in 2014 to restore a railway damaged by a great tsunami of the 2011 Great East Japan Earthquake, are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call