Abstract

Stratified water injection is the most important characteristic technology in Daqing oilfield development, providing technical support for efficient oilfield development. With the oilfield entering the ultra-high water cut stage, the remaining oil is highly dispersed, the oil-water relationship is complex, the qualified rate of water injection decreases rapidly, and the difficulty of stabilizing oil and controlling water is increasing. In order to solve the contradiction between the increasing workload of water injection well testing and the limited testing team, and mee t the needs of oilfield precision development, the cable-controlled layered water injection technology has been developed. In this technology, the pressure monitoring system, flow monitoring system and flow control system are placed in the preset cable intelligent water distributor. At the office end, the technicians send control instructions on the server software, and send them to the ground control box through the oilfield production wireless network. The cable carrier technology is used to transmit the instructions to the intelligent water distributor through the cable, so as to achieve real-time communication, obtain the downhole layering parameter information, and control the downhole layering injection volume. Ten intelligent injection technology demonstration areas have been built to verify the process adaptability under different development contradictions. The cable-controlled layered water injection technology improves the proportion of water absorption thickness, effectively controls the water cut rise rate and natural decline rate, and has obvious oil increase effect, promoting the digital transformation and intelligent development of the oilfield.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call