Abstract

Repowering one of the old Indian wind farms located at a potential wind site is discussed. Various options of repowering have been suggested and compared based on annual energy production and levelised cost of generation. Economic performance indices of repowering in the current wind power policy scenario have been evaluated and the feasibility is discussed. The study infers that partial repowering could be economically more attractive than total repowering, whereas total repowering of old wind farms located at potential sites would be essential to meet renewable energy targets of a nation like India.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.