Abstract

The existing concrete viaduct 560 m long at the link between M-40 ring road and M-607 expressway in Madrid (Spain) was subjected to a very comprehensive process of evaluation and testing after high deck deflections and surface cracking were detected. As conclusion of these studies very severe damages and a process of concrete degradations were confirmed which led to the decision of dismounting the existing deck structure and constructing a new one supported on the existing substructure which had to be repaired and reinforced. Grupo Puentes has carried out both the process of deck disassembly and the construction of the new deck in a record time of approximately nine months. The viaduct is in a very traffic congested link to approach Madrid and crosses over not only the main roads, M-40 ring road and M-607 expressway, but also two approach ramps and two railway lines, one of them high-speed line.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.