Abstract

The prediction of remaining creep life by the Iso-stress method was investigated for 153500h service-exposed boiler tubes of 1.25Cr-0.5Mo-Si, 2.25Cr-1Mo and 9Cr-1Mo steels. At first, the internal pressure creep rupture strength of the service-exposed tube specimens of the steels was shown to be the same as the tensile creep rupture strength of the sheet specimens taken from the tubes. Then the temperature-accelerated creep rupture tests under iso-stress were carried out by the tensile creep rupture tests, because of simplicity of the tests. The Iso-stress method was verified for the virgin specimens of the steels by comparing the predicted long-term rupture times as long as 105h with the data in the NRIM Creep Data Sheets. The predicted rupture times agreed with the observed data within a factor of 2 or 3. The temperature-accelerated tests of the sheet specimens taken from the service-exposed tubes showed that the linear extrapolation of the rupture times to the service temperature gave the remaining creep rupture life of about 8×105h for the 1.25Cr-0.5Mo-Si steel and about 1.6×106h for the 2.25Cr-1Mo steel. However, the Iso-stress method could not be applied for the 9Cr-1Mo steel, because the logtr versus T curve was not linear, where tr is the creep rupture time and T is the testing temperature. It is concluded that the Iso-stress method is useful when the significant microstructural change does not take place during accelerated creep rupture tests at high temperatures.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call