Abstract

ERCOT is transitioning from a current zonal market to a newly redesigned nodal market. In the new ERCOT nodal wholesale market, a Reliability Unit Commitment (RUC) process is designed and implemented to ensure transmission system reliability and security. The main objective of RUC is to ensure that enough resource capacity, in addition to ancillary service capacity, is committed in the right locations to reliably serve the forecasted load in the ERCOT system. The RUC is implemented in a Security Constrained Unit Commitment (SCUC) framework that minimizes the total operation costs based on generator three-part supply offers subject to various system and resource security constraints. Some enhanced features have been implemented in the RUC SCUC engine to handle special resource scheduling such as combined cycle resources, split generation resources and self-committed resources. The RUC settlement uses a ldquomake-wholerdquo payment to ensure all generating resources committed by RUC are adequately compensated for their operation costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.