Abstract
This paper deals with a 2-unit cold standby redundant system with two types of failure and preventive maintenance (PM), from the point of view of cost-benefit analysis. The system has been studied using regenerative points.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have