Abstract

In deregulated electricity market environment, the power system works with lower stability margin due to demand fluctuations. Therefore, in restructured power systems all generation companies attempt to increase reliability of their own power plants. The arrangement of the busbar layouts in power stations has a great effect on the power system reliability. This paper develops a sequential Monte Carlo simulation (SMCS) to evaluate the effect of generator breaker and bus-section on the reliability indices of one and half and two-breaker busbar layouts. Karun III power station layout in Iran national grid (ING) is considered as a real world system case study. The most commonly used reliability indices such as loss of load expectation (LOLE), expected energy not supplied (EENS) and expected load curtailment (ELC) are used to evaluate the reliability in this paper. Economic and technical evaluations of reliability indices variation in presence of generator breaker and bus-section are presented. Simulation results show that how variation of forced outage rate (FOR) of generator and generator breaker affect on the reliability indices.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.