Abstract

This paper investigates the reliability behaviour of a non-repairable parallel redundant complex system which is nothing but a power plant. The object of the system is to supply power generated by three generators from a power house to a very critical consumer, connected by cables and switches etc. The reliability of the power supply to the critical consumer has been obtained by using the Boolean Function technique. Moreover, an important parameter of reliability, viz. M.T.T.F. (mean time to failure), has also been computed for exponential failure rates of components. A numerical example with graphs has also been appended in the end to highlight the important results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.