Abstract
At the continuous-casting line at NLMW we have tested pouring with a protected stream of metal from the steel-pouring ladle with the aid of quartz and graphite-chamotte tubes. It was established that the optimum design of the protective device consists of a refractory tube 750 mm long in conjunction with a stationary tube fixed on the lid of the intermediate ladle. At the point of junction between the two tubes, inert gas is injected to give additional protection. The structure of the device for bringing the tube up to the ladle should ensure tight joining of the tube with the collector nozzle and mobility of the tube during pouring.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.