Abstract

Questions of the method of production of basic ramming compounds at Panteleimonovka Refractory Plant and their use in the monolithic lining of the walls of 160-ton steel-teeming ladles of the No. 2 Converter Shop of Kirvoi Rog Steel Combine are considered. An analysis of the wear of the lining during service showed that it occurs as the result of spalling of the sintered zone and salamandering of the lining. The use of a movable thermally insulated lid made it possible to hold the temperature of the ladle lining within limits of 730–1120°C between heats and to obtain a basic rammed lining life of 21–39 heats as opposed to an average life for the shop of 14.8 heats. A reserve for increasing the ladle basic lining life is optimization of the thermal conditions of its service, including high-temperature heating of the lining before pouring of the metal, the use of thermally insulated lids with the minimum consumption of time for placing of them, an increase in the life of the well refractory to the life of the walls and bottom, and elimination of cooling of the lining between heats.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.