Abstract

PurposeThe UK construction industry produces up to one third of all waste to landfill. This study aims to identify specific project practices impeding the reduction of waste in construction projects as well as uncovering potential waste solutions throughout the project delivery process. The rationale being that for such a drastic reduction in waste to landfill, holistic and extensive measures would be required.Design/methodology/approachA two‐way methodological approach was used. This comprised qualitative unstructured interviews and a quantitative questionnaire survey of three major stakeholders in the UK construction industry: clients, architects and contractors.FindingsDesign factors remain the major cause of impediments to waste reduction to landfill. Critical impediments include clients making waste prevention a top priority in projects, overly complex designs, waste taking a low priority compared to project time and costs, lack of concerns by designers for buildability, among others. Critical solutions include early supply chain involvement in design process, choosing materials for their durability, early communication of design changes to all parties, longer project programmes and better lead times, among others.Practical implicationsIn all, the target of halving construction waste to landfill based on the 2008 benchmark is achievable but would require construction companies to take it upon themselves to implement the proposed solutions suggested by this study.Originality/valueThe value of this research is to provide UK construction companies with solutions to reduce waste and aid the reaching of the landfill target, as landfill is decreasing as a solution to waste. In addition the cost savings on reducing waste could be crucial for companies in this current economic climate.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call