The paper deals with a case study for carried out in order to justify the installation of a gas cogeneration system fitted with an internal combustion engine, system used to supply electricity and heat to the users of an energy user which exceeds 1000 toe/year. 2 scenarios were therefore compared based on the energetic analysis:-the actual scenario in which energy is supplied from the National Energetic System.- the scenario in which a combined heat and power plant is used.The amount of energy saved yearly, the specific fuel consumption and the environmental impact were determined by the comparative study. The diagrams representing the variation of the performance indicators according to the operation period were also created. The usefulness of the paper consists in the creation of the yearly optimum installation operation time chart.

Highlights

  • Cogeneration defines those processes in which the useful electric energy and the thermal energy are simultaneously produced through fuel burning

  • The purpose of the present paper consists in creating a basis, focusing on a case study, for to the necessary steps required in order to justify the use of a gas cogeneration installation with a combustion engine destined for the supply with electricity and heat to the users of a certain company

  • The solution used to render the cogeneration group more efficient is proposed considering the energy usage chronogram

Read more

Summary

Introduction

Cogeneration defines those processes in which the useful electric energy (or mechanical energy) and the thermal energy are simultaneously produced through fuel burning. The polluting emissions per useful energetic unit may be significantly reduced through cogeneration, corresponding to the economy of unused fuel, compared to the separate production of heat and electricity. The purpose of the present paper consists in creating a basis, focusing on a case study, for to the necessary steps required in order to justify the use of a gas cogeneration installation with a combustion engine destined for the supply with electricity and heat to the users of a certain company. In order to render the energetic source more efficient, to reduce the expenses as well as the environmental impact, the acquisition and installation of a cogeneration unit with a combustion engine is proposed. The obtained results are brought forward following the realisation of an hourly energetic balance:

ACTUAL SITUATION
Results
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.