Abstract
Summary Oil productivity from Mumbai High field, an offshore multilayered carbonate reservoir, increased significantly through the implementation of a major redevelopment program. Geoscientific information available from approximately 700 exploratory and development wells drilled in the field during nearly 25 years was incorporated during geological and reservoir simulation modeling of the field. High-technology drilling (viz. horizontal/multilaterals for the new development wells) was adopted on field scale to effectively address typical complexity of the layered carbonate reservoirs. Since the commencement of the project in 2000, approximately 140 new wells were drilled, mostly with horizontal and multilateral drainholes. Besides these, more than 70 suboptimal producers were also converted as horizontal sidetracks under brownfield development. The horizontal sidetracks were drilled as long-drift sidetrack (LDST), extended-reach drilling (ERD), LDST-ERD, short-drift sidetrack (SDST), and medium-radius drainhole (MRDH) types of wells through the application of innovative and emerging drilling technologies with nondamaging drilling fluids, whipstocks to kick off sidetrack wells, rotary-steering systems, and expandable tubulars to complete horizontal sidetracks in lower layers. With the implementation of this project, the declining trend was fully arrested and a significant upward trend in production has been established.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have