Abstract

The retrofit design of a multipurpose batch pilot plant is studied so as to accommodate the addition of a new product. A model is utilised which represents in detail structural and operational characteristics as required for production scheduling, while also accounting for cleaning in place (CIP) integration. The State Task Network concepts for defining process recipes and procedures are augmented by the definition of the equipment states (unit dirty, connection clean, etc.). A superstructure of several proposed plant modifications is considered to debottleneck the plant and provide increased flexibility, including piping reconfigurations and the replacement of the existing flow plates with double seat valves manifolds. The retrofit problem is formulated as a Mixed Integer Linear Program (MILP) and solved using a branch and bound technique. The best compromise between extra capital cost (plant reconfiguration) and operating cost/revenues (operating schedule and production amount of the new product) is obtained by maximising the annualised profit. Results show that a small capital expenditure permits the production of the new product within the original time horizon.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.