Abstract
The front end test stand (FETS) is a demonstrator for a future high intensity, high duty factor negative hydrogen (H') ion injector. With the radio-frequency quadrupole (RFQ) nearing installation, the ion source has been re-commissioned in preparation for long-term operation. The 3 MeV beam exceeds the radio-activation energy of common engineering materials, so radiation shielding has been erected. A new interlocking scheme has been signed-off which integrates the existing ion source high voltage area with the new shielding access points, to ensure that the machine can operate safely during beam production. The existing vacuum arrangement has been extended to in-clude the RFQ and medium energy beam transport (MEBT) line. A new programmable logic controller (PLC) has been built to operate the entire vacuum chain. The ion source high voltage equipment has been upgraded to minimise both spark rate and intensity. A collimating aperture and Faraday cup have been installed after the low energy beam transport (LEBT) section to ensure the beam is well aligned for injection into the RFQ. Re-commissioning the ion source has given a rugged shakedown of all these new systems before beam is required for the RFQ.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have