Abstract

The Georgina Basin covers an area of 325,000 sq km in the Northern Territory and Queensland. Most of the basin contains less than 500m of Palaeozoic sediments, but the Toko Syncline, in Queensland, contains up to 5000m of Middle Cambrian to Middle Ordovician shallow marine carbonate, sandstone and shale. The syncline is bounded on its western margin by the Toomba-Craigie Fault systemHydrocarbon shows are known within the Middle Cambrian to Middle Ordovician strata and some of the rocks have fair source rock potential. Potential reservoir rocks are vuggy dolostones and sandstone. Ordovician siltstones and shales may provide cap-rocks. The southern, deepest part of the syncline appears to have been protected from flushing. AOD Ethabuka-I well, drilled in the southern part, encountered gas in the Ordovician, but drilling problems prevented penetration of the deeper section.A Bureau of Mineral Resources (BMR) seismic survey in 1977, linked lines shot on earlier surveys, tied to wells and examined the Toomba Fault system. The results show that two previously unidentified reflectors represent the top of Upper Cambrian Georgina Limestone and the base of the Middle Cambrian section. Substantial thickening of Ordovician and slight thinning of Middle and Upper Cambrian strata occurs southeast along the axis of the syncline. Southeast progradation of some Middle Cambrian strata and possible bioherms were observed. The Toomba Fault is a high-angle reverse fault and several possible anticlines are present in the adjacent folded and faulted zone. The two largest ones, the Ethabuka and Mirrica Structures, were partially outlined by Alliance Oil Development (AOD). They are shown to lie within a larger structure which has a minimum vertical closure of 700m over a minimum area of 130 sq km. Possible stratigraphic traps are located on the northeastern flank and along the axis of the syncline.The seismic work has better defined the prospective section and confirmed closure on a large structure. The next step in exploration should be to drill the Mirrica-Ethabuka Structure, where about 1500m of section remains to be tested.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.