Abstract
Cutaneous leishmaniasis (CL) is a severe parasitic disease affecting people, mostly in underdeveloped nations. As a zoonotic infection yearly incidence of CL depends on several parameters such as demographic, epidemiological, and environmental factors as well as prevention and control measures. The sudden outbreak of pandemics such as SARS-Corona-Virus-2 pandemic, can probably affect the incidence or reporting of other diseases, especially infectious diseases, in various ways such as pressure on health systems, providing sanitary services and its components, lockdowns and changes in people's living habits. This study aimed to evaluate the COVID-19 impact on the incidence and other epidemiological aspects as well as control measures of CL in Ilam Province-Iran. Required data was extracted from the CL registration system in Ilam from 2014 to 2021 to demonstrate the trend of CL incidence before and after COVID-19 pandemic. Based on our results, a declining pattern of CL incidence was observed, accompanied by the advent and intensification of the viral pandemic in Iran and Ilam province. Although, this decreasing pattern was not integral in all areas, and even increase in CL detection was emphasized in some regions. It may be inferred that the COVID-19 pandemic may disrupt treatment programs of CL cases, rodent nest destruction, and fighting vector insects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have