Abstract

Re-fracturing is one of the main methods to increase single well production and stable production time for horizontal wells in tight reservoir. The optimization of re-fracturing method is very important for improving the development efficiency of horizontal wells after the treating of re-fracturing. Taking Chang 7 tight Reservoir in Ordos Basin as an example, a model for predicting the productivity of horizontal wells after re-fracturing is established by numerical simulation, and the effect of horizontal well development under different fracturing modes is studied. The results show that the best perforation method for Chang 7 tight oil reservoir is to increase the new perforation position and only fracturing the new perforation section according to the fracturing cost and stimulation effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call