Abstract
The objectives of the research reported in this paper were to monitor and document the rapid bridge deck replacement work of the Georgia Department of Transportation (GDOT) on two bridges in Gainesville, Ga., and two bridges in Atlanta. Documentation of the GDOT work included a time sequence, deck replacement square footage per work period, total construction time, typical work period construction tasks, and photographic display/discussion of the deck replacement work. The precast exodermic deck panel system used by the GDOT provided an excellent means for rapid bridge deck replacement while under staged construction/concurrent traffic conditions. The GDOT work was completed within the imposed time limits while maintaining minimum traffic interruption.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Practice Periodical on Structural Design and Construction
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.