Abstract

Full-depth precast concrete bridge deck panels are connected to the girders on site by shear connectors to create a composite action and to prevent relative movement between the beam and the precast deck during all loading levels. This research study experimentally investigates different connection details that can provide a load transfer mechanism between concrete girders and precast deck panels to ensure full composite action. Three connection details were investigated: unconfined studs, confined studs and rebar dowels. Six specimens were cast and tested in direct pull-out or push-off tests. The confined studs showed the highest shear capacity at low displacement levels as well as the highest pull-out capacity. However, the three configurations showed higher capacities than expected according to the Canadian highway bridge design code.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.