Abstract

In this article, proposals are presented on the scientifically substantiated choice of most cost-effective version of the metal domes of the building from a number of alternative designs that differ from each other in a constructive form. Proposals are to modify Professor Ya. M. Likhtarnikov’s methodology to determine the labor intensity and cost of manufacturing of metal building structures. The authors propose that introducing predetermined weighting factors, to determine the future cost of constructing a building. This approach allows us to get an idea of the economic effectiveness of the coating design in the early stages of design. An algorithm for determining the weight coefficients for metal coatings is presented. In order to generalize the given methodology, the authors propose to make standardization of technical and economic indicators of domed structures. As a result of the normalization of the indicators for different variants of constructions, a formula is derived for an operative estimate of the value of any dome from one generalized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.