Abstract

An assessment of radiological risk of a proposed site for a generic VVER 1000 MW nuclear power plant has been conducted using international radiological assessment system (InterRAS) code and HotSpot Health Physics Code in view of Ghana's plan to add nuclear energy to her energy mix. The radiological risk assessment was estimated by considering a hypothetical accident event for a generic VVER 1000 MW at the proposed site. The kind of radionuclides to be release from the fuel meat to the gap between the meat and the clad defined the intervention measures and countermeasures. The available radionuclide for the hottest fuel rod was determined by depleting the core, a method sometimes termed as “source term estimation”. The direction of trajectory and Total Effective Dose Equivalent (TEDE) received with the corresponding ground deposition of the released radionuclides were estimated. The right protective actions were determined by estimating the appropriate intervention distances. The maximum TEDE calculated were 3.7 × 10−1 Sv at 0.1 km and 3.7 × 10−1 Sv at 0.18 km for InterRAS and HotSpot codes respectively towards the north-east of the release point. Radiological doses of 10 mSv and above was limited to 1.0 km from the point of release. The intervention level for evacuation (50 mSv) ends at 0.5 km for InterRAS code and 0.7 km for HotSpot code. The intervention level for sheltering (10 mSv) also ended at 1.5 km for both InterRAS and HotSpot code. The highest total radionuclide ground deposition was estimated to be approximately 4.0 × 106 kBq m−2 at 0.1 km and 3.8 × 106 kBq m−2 at 0.18 km for InterRAS and HotSpot respectively. Beyond 5.0 km distance, the ground deposition was in the range of 0.1–1 kBq m−2. Generally, the estimated annual effective dose for the public was less than the 1 mSv limit, which is the annual allowable limit for the public. Therefore, with respect to the outcome of the estimated results, there wouldn't be any radiological risk above the allowable limit, hence the site can be considered as the candidate site for the construction of the proposed nuclear power plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.