Abstract

Pre-grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone. Two important questions need to be answered during such an excavation. First, how should the grouting size be determined? Second, when should excavation begin after grouting? These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach, which would be preferable, has not yet been developed. To address these questions, we apply a recently proposed numerical approach known as discontinuity layout optimization, an efficient node-based upper bound limit analysis method. A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions, including soft soil and a fault zone. The factor of safety is used to quantitatively assess the stability of the tunnel section. The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated, thereby assisting designers by quantitatively assessing the effects of pre-grouting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.