Abstract

Construction projects have a high level of uncertainty because of several risk factors. Risks may affect projects in many ways resulting in time delays or cost overruns. Thus, the evaluation of uncertainty is required to get a reliable schedule. This research proposes a method for project scheduling considering risks. Expert judgment is used to identify and analyze risks. Potential risks are identified through Failure Mode Effect Analysis (FMEA). Risks impact is evaluated through fuzzy logic and Monte Carlo Simulation (MCS). The simulation considered the relationship between risks, and risks and activities.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.