Abstract

Building information modeling (BIM) design validation is primarily aimed at responding quickly to serious design errors. A prompt response to BIM request for information (RFI) can significantly enhance the BIM return on investment (ROI). Although prior research has identified additional factors to consider while assessing the benefits of BIM coordination, it was not possible to conduct an economic assessment. Therefore, this study fills this gap by conducting an economic assessment of the introduction of priority policies in BIM coordination using priority queue model. The findings demonstrate that the introduction of priority policies can impact the optimal BIM staffing and the engineers' waiting cost for high-priority RFIs. We quantify the BIM ROI that can be improved by introducing the priority policy in BIM coordination, using time and cost metrics derived from the queue model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.