Abstract

Tunnel engineering based on the shield method is an extremely complex project. During the construction process, many uncertain factors are often faced, which makes it difficult to effectively and quantitatively evaluate the effectiveness of the shield machine. To solve this problem, this paper proposes an adaptability evaluation method for shield machines based on the fuzzy analytic hierarchy process (FAHP) and analytic hierarchy process (AHP). First, the selection and equipment matching of Earth pressure balance shield machines in the shield interval between Tashuiqiao Station and Erxianqiao Station of Chengdu Metro Line 17 are introduced. Then, using APH for screening, the final evaluation indices of the adaptability of the shield machines in this project are determined. Next, referring to the existing research results and fuzzy mathematics method, the membership function of the evaluation indices and adaptability evaluation model of the shield machine are constructed. Finally, the rationality and accuracy of the fuzzy comprehensive evaluation model of shield adaptability are verified through onsite shield construction, and the evaluation results are consistent with the actual situation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call