Abstract
In the Australian sugarcane industry, the decision about when to start the harvest season (which runs from approximately June through to November) must be made no later than March. This is necessary to give sugar milling personnel sufficient time to complete important mill maintenance procedures prior to commencement of harvest. The harvest season must start early enough so that all sugarcane is harvested before the rainy season commences, but late enough to capitalize on the higher sugar content in the cane stalk, which forms the basis of industry payment. An early indication (e.g. January) about likely rainfall conditions during the latter half of the harvest season (e.g. September to November) would provide crucial information to industry planners when deciding the start of the harvest season. By coupling a long-lead statistical ENSO prediction scheme with the cane payment system, we investigated the ability of the climate forecast model to deliver a quantitative benefit to the Herbert sugarcane region. Through the use of bootstrapped confidence intervals, we found the region could benefit by up to 1.9 million AUD per annum by starting the harvest season later than that conventionally practiced when warm ENSO conditions were predicted for the end of the harvest season. Copyright © 2011 Royal Meteorological Society
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.