Abstract

RMW Inc. is the global company in Indonesia. One of its product is the steel wire rod. This research aims to control the production process and improve the product quality. This research is using the integration between lean six sigma and taguchi method. The first step is to reduce the waste using lean six sigma method while the second step is to reduce the defect using taguchi method. Based on the identification of seven waste, the most dominant waste is the defect that is caused by there is no setting of the roll entry guide. The product has 11 CTQ (critical to quality) with the focus on laps defect, underfill defect, and overfill defect. Then, the cause of failure is identified using FMEA (failure mode effect analysis). The level of sigma capability is achieved at 4.54 with DPMO (defect per million opportunities) is 4006.55. The first improvement can reduce the time until 8.9 minutes. The second improvement sets the roll entry guide. The optimum factors for setting of the roll entry guide is A factor with 150 tonnages of wear level, C factor by 5 bar of cooling and D factor by 6 ml of lubrication.

Highlights

  • 1.1 Background RMW Inc. is a steel company consisting of several factories

  • Over the past few years, RMW Inc. often perform production processes resulting in waste and declining product quality

  • Based on the formulation of the problems, the purpose of this study are as follows: 1. Identify the waste contained in the production process of SWRM 8 in the wire rod factory of RMW Inc. 2

Read more

Summary

Introduction

1.1 Background RMW Inc. is a steel company consisting of several factories. One of the factory is the wire rod steel. Over the past few years, RMW Inc. often perform production processes resulting in waste and declining product quality. SWRM 8 is the product that has the largest number of defects compared to other grades. The total defect of SWRM 8 is 404 coils of total production of 100959 coils. Improving the quality and control of production processes needs to be done continuously by eliminating waste to produce optimal production process and reduce the defect of steel wire rod products SWRM 8

Objectives
Findings
Methods
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call