This bridge consists of a. series of portal frames, of 96 m span each, making up a total length of about 500 m. The piles over the river have caused certain difficulties, and it became necessary to build a number cofferdams with sheetpiling, which became permanent formwork for the concrete foundations. The deck is a box section beam, of prestressed concrete. The most notable aspect of this structure is the constructive method. The total length of the deck was divided into 50 sections, each of them prefabricated at a nearby workshop. Each section was aligned along the deck axis: the deck already built serving as sliding ramp for each successive section. To carry out this difficult operation, neoprene was employed, which has a very low friction coefficient, on sliding over steel. To push the heavy table sections to their final position use has been made of hydraulic jacks. After these initial operations were completed, the groups of prestressed cables were correctly aligned: these cables had been provisionally stretched, during the process of putting the deck sections together. These groups of cables are attached to the inner surface of the side walls of the box sections of the deck.

Highlights

  • N vido de rampa para el traslado y corrimiento a su posición definitiva

  • Estos paquetes de cables van adosados, cada uno, a la parte interior de los tabiques laterales de la viga-cajón que constituye la estructura del tablero

  • Una vez terminado el desplazamiento en un punto, correspondiente a un vértice de la poligonal, se termina el hormigonado de un marco rigidizador de la viga cajón, que transmite también a la estructura las fuerzas provocadas por el desvío de los cables

Read more

Summary

Introduction

N vido de rampa para el traslado y corrimiento a su posición definitiva. Para esta delicada y notable operación se h a utilizado el neopreno, que presenta un coeficiente de rozamiento muy pequeño al deslizar sobre acero. El conjunto del tablero está constituido por una viga-cajón, de hormigón pretensado. Terminadas todas estas operaciones, se procedió a rectificar el trazado de los paquetes de cables del pretensado que provisionalmente se habían tesado antes de procéderai corrimiento.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.