Abstract
Probabilistic methods are being used increasingly in construction engineering. However, when a parameter is expressed in linguistic rather than mathematical terms, classical probability theory fails to incorporate the information. The linguistic variables can be translated into mathematical measures using fuzzy set and system theory. A construction management problem, i.e., estimation of the duration of an activity, is solved using this theory. In order to implement the proposed technique, various membership functions need to be estimated using judgment or with the assistance of experts. The proposed technique is not sensitive to small variations in the membership values. This is a very desirable property. However, the method is sensitive to the choice of the fuzzy relations. The uncertainty in the fuzzy relations can be modeled along with other sources of uncertainty. The mean and variance of the parameters involved in the problem under consideration are estimated here using a new method. The method maxi...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.