Abstract

The making of informative media in the form of three-dimensional animation on Trans Jogja bus routes really requires good project planning so that the process becomes more effective and efficient. In planning a project, it is necessary to consider the time, cost and scope of a project. Project optimization is done by using the Critical Path Method (CPM) method, which is a technique of analyzing network activity activities or project activities that predict total duration. Project optimization planning through the stages starting from the creation of the Work Breakdown Structure, barchart diagrams with Gantt Chart software, critical path calculations, and the final stages with CPM to determine the fastest time possible for the project to be completed. The results of the WBS are obtained by predecessor of each activity and its duration, the calculation of the critical path is 29 days with path a-b-c-d-e-f-g-h-I-j-l-m-n-o, and from the CPM calculation the total float is 0 so the project can be completed on time

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.