Abstract

The complete project is defined as consisting of a number of ‘islands’, and the power station plant supply is defined as one of these. Details are given of the timescale for the project and the procedures before the placing of the contract. The project management objective and the management structures are defined. There follows a discussion on who the parties are who are being controlled, their relationship and the methods by which this control is being exercised. The structure in the purchasers' office and at site is discussed, and the paper concludes by summarising the essential lessons which have been learned.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.