Abstract

This research applies Project Evaluation and Review Technique (PERT) model to estimate acceptable duration for execution of each activity having random variable of time and some probability distribution for sand dredging operation in Niger Delta. The study takes into account proper planning, scheduling, controlling and allotment of dredging activities time using a project network model PERT. The model evaluated how acceptable time and saving cost could be achieved in a scenario of activities having random time variables. Readily available data of activities time from 2014 – 2017 were used to analyze the time estimate for various activities at a selected dredge site Aleto-Eleme in Port Harcourt metropolis Rivers State-Nigeria. The PERT was applied for the data analysis, to construct the PERT scheme for the dredging operations. Finally, parametric control for project evaluation and review techniques of acceptable time for the dredging activities were determined.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.