Abstract
Our study of the London Olympics 2012 construction programme showed that systems integration is one of the major challenges involved in delivery of a complex – “system of systems” or array – project. Organizations cope with complexity by decomposing a project into different levels of systems integration with clearly-defined interfaces and buffers between levels and individual component subsystems. At the “meta systems integration” level, an organization has to be established with the capabilities to understand the total system of systems, manage external interfaces with the multiple stakeholder sand coordinate the integration of its component parts. At the “system integration” level, efforts are made to manage each individual system as a loosely-coupled, relatively self-contained subsystem with defined interfaces to coordinate interdependencies with other parts of overall array. Establishing processes to maintain stability whilst responding dynamically to uncertain and changing conditions is one of the most challenging aspects of systems integration.
Accepted Version (
Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have