Abstract
The paper describes the organization of the Test Blanket Module (TBM) program, its overall objective and schedule and the status of the technical activities within the ITER Organization-Central Team (IO-CT). The latter include the design integration of the Test Blanket Systems (TBSs) into the nuclear buildings, ensuring all interfaces with other ITER systems, the design of the common TBS components such as the TBM Frames, the Dummy TBMs, and the TBS maintenance tools and equipment in the TBM Port Cell as well as in the Hot Cell building, the design of the TBS connection pipes and the definition of the required maintenance operations and associated R&D. The paper also discusses the major challenges that the TBM Program will be facing in ITER such as the potential impact of the TBMs ferritic/martensitic structures on plasma operations, the approaches to tritium and contamination confinement, the required mitigation and recovery actions in case of accidents, and the assessment of the reliability aspects that could have an impact on ITER availability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.