Abstract
The objective of the ITER TBM Program is to provide the first experimental data on the performance of the breeding blankets in the integrated fusion nuclear environment. Such information is essential to design and predict the performance of DEMO and future fusion reactors. It foresees to test six mock-ups of breeding blankets, called Test Blanket Module (TBM), in three dedicated ITER equatorial ports from the beginning of the ITER operation. The TBM and its associated ancillary systems, including cooling system and tritium extraction system, forms the Test Blanket System (TBS) that will be fully integrated in the ITER machine and buildings. This paper describes the main features of the six TBSs that are presently planned for installation and operation in ITER, the main interfaces with other ITER systems and the main aspects of the TBM Program management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.