Abstract
The functions and the need for an independent core analysis capability are addressed and the objectives of the transfer of core analysis technology to the reactor owner/operator are stated. The technology involved is described. The analysis methodology is briefly summarized and the various computer program modules that comprise a core analysis system are delineated. The activities of the utility staff during the transfer of core analyses technology are summarized. These activities encompass the time periods prior to startup, during startup and during commercial operation. The computer requirements necessary to implement the core analyses system are tabulated. A schedule and time frame for implementing the transfer of technology consistant with the activities is presented along with the staffing requirements and a brief description of the disciplines and interests required for a viable staff.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have