Abstract

At Krasnoyarsk CHPP-2, there emerged a necessity of supplying heat to consumers faster in cold months because even short-term absence heating can be critical. The main challenge is to execute complex control process for all boilers at the same time to ensure their gradual heating or cooling. In order to solve this problem, it is suggested to create program control. The software that needs to be created should quickly (7-9 minutes) change the power and control their operation in a timely manner in case of any changes, taking into account the individual specifications of each boiler. Final testing and examination are proposed to be carried out on the created CHPP model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.