Abstract
In the world of heavy equipment construction projects it is important to help complete human work. Tower Crane is one of the tools in the implementation of construction projects. In the implementation of the construction of Apartment 31 Sudirman Suites Makassar, there are 2 Tower Crane tools that operate with limited work time due to covid 19. This research was carried out by direct observation in the field and calculating the real value of the specifications to compare productivity. Tower Crane productivity is the result achieved or output, namely the amount of material moved by Tower Crane with all resources or inputs, namely the time required for material transfer. Based on the calculation results that the productivity of the specification is greater than the productivity of observations in the field, this is due to constraints on the weather that occurs and the equipment operator. For productivity, the average obtained on the 4th floor is 71,544 (%) and on the 5th floor it is obtained that is 73,727 (%).
Highlights
Pada pembangunan proyek tidak bisa lepas dari peralatan yang digunakan dalam menunjang keberhasilan proyek
2 Tower Crane tools that operate with limited work time
namely the amount of material moved by Tower Crane with all resources or inputs
Summary
Penelitian ini dilakukan pada proyek Pembangunan Gedung Apartemen 31 Sudirman Suites Makassar yang berlokasi pada jalan Jenderal Sudirman No 31, gedung ini dalam tahap pelaksanaan. Apartement dibangun di atas lahan seluas 3,949 m2, dan menyediakan total 256 Unit Suites yang terdiri dari 190 unit 2 bedroom suites, 20 unit 3 bedroom Premier Suites, dan 46 unit 3 bedroom Private Suites
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have