Abstract
In present global scenario where time and cost have become synonymous with one another, it is important improve the overall performance of the industry. Heavy industries such as automobile industries invest a lot of time and money in establishing manufacturing facilities which demands effective utilization of resources to save time and money. This research is an attempt in an assembly line to analyze and expose the effect of sequencing based on the takt time and its impact over the performance of the line. Initial study involves monitoring and standardization of process time for all operations using Maynard Operation Sequencing Technique. Work is further extended to the concept of sequencing and simulation. Calculated process time are used to sequence the operations based on standard Priority Dispatching Rules such as Longest Processing Time, Shortest Processing Time, Potential Score Method, Followers Based Ranking and a custom developed model based on takt time. Discrete Event Simulation of the assembly line was run for all these sequences and it was found that the model developed based on takt time fetched the best results. The model also showed the maximum utilization, line efficiency among all models and had a much better smoothness index than other models.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Innovative Technology and Exploring Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.