Abstract
ABSTRACT Metering equipment has been developed which can accurately measure the percent watercut in addition to the total flow rate of an emulsion stream. This makes possible the use of two-phase (liquid and vapor) vessels for accurate production well testing purposes. This alleviates the need to use more costly and less operationally efficient three-phase vessels.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have