Abstract

Production scheduling problems and traditional differential evolution(DE) are analyzed in this paper. Taking the minimum of total completion time as the objective function of production scheduling, a production scheduling model is established for batch processes in process industry.Considering that the performance of the traditional DE algorithm is sensitive to the parameter settings,an adaptive control evolution strategy is used to control the parameter scale factor F and crossover probability CR to solve the problem of parameter settings. Taking a practical production problem as a scheduling example,the established model and adaptive DE algorithm are applied to implement the production scheduling simulation. The simulation results show that compared with the ant colony system(ACS) algorithm,the adaptive DE algorithm is effective and feasible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.