Abstract
Queuing models have demonstrated the nonlinear relationship between resource utilisation, which is determined by production planning decisions, and lead times. Both production planning decisions and safety stock levels are driven by lead times, and are thus tightly interrelated. However, production planning and safety stock calculations have generally been carried out separately. We propose a production planning model for a singlestage singleproduct system that integrates release planning and safety stock considerations. Concave clearing functions are used to capture the nonlinear relationship between resource utilisation and lead times, while chance constraints represent the need to plan inventories to achieve desired service levels. Extensive computational experiments indicate that the proposed model provides an excellent tradeoff between customer service and inventory costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.