Abstract

This paper formulates the hydrothermal production planning problem as a multi-stage stochastic programming model. This problem is usually solved using algorithms that are based on dynamic programming and nested Benders decomposition (NBD). The hydrothermal planning problem is remodelled as a capacitated production planning model with convex costs; then a vanishing effect property of the first period decision is derived. Based on this property, a special implementation scheme of the NBD algorithm is proposed, providing faster convergence and less computational effort. The NBD algorithm is implemented for a large-scale hydrothermal power system of the Pacific Northwest in the USA with 20 thermal plants and 21 thermal plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.