Abstract

AbstractSulphate removal by chemical precipitation from the wastewater of a wire‐welding facility was investigated. Sulphate was precipitated by using limestone and a small amount of lime. Firstly, the relationship between the ionic strength of wastewater and sulphate removal efficiency was established. A kinetic study of sulphate precipitation was also conducted. Finally, modification of plating process was proposed to achieve the highest sulphate removal. According to the suggested modification, the sulphate concentration of final discharge could be down to 425 mg/L. Hence, if wire‐welding facilities modify their systems so that the wastewater is treated at the highest level of sulphate contents, the removal efficiency will be the highest, i.e. lesser amounts of sulphate will be discharged into sewage systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.