Abstract

Building industry production shall be considered as a complicated hierarchy system, whose conditions are related to multiple factors. To manage such complicated systems, mathematical modeling methods shall be used to organize awareness of manufacturing parameters, to increase the effectiveness of decisions being made by personnel on different positions and within the process, also to develop construction materials production management systems. In turn, synthesis questions with regard to the management of this process are largely resulted from the deficiency in mathematical model concerned, suitable for practice. Outputs of work on the process control system software for autoclaved concrete production are presents in the article. A justification for the most efficient process control stage is given. A control algorithm is developed for the selected process stage, based on a mathematical model of the end product quality as a function of raw materials demand prepared by authors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.