Abstract

ABSTRACT Among various quality assurance activities, process capability indices (PCIs) are recognized as the most effective tools to quantify and evaluate process performance. The one-sided capability index can adequately measure the process capability for processes with a smaller-is-better (S-type) quality characteristic. While focusing on the index , this study constructs a capability control chart to monitor the short-term capability based on the exponentially weighted moving average (EWMA). Simulations have shown that the EWMA capability control chart is adaptive regarding average run length. Further, this study applies change-point analysis to determine whether and when the short-term capability-level changes. Using these two proposed methods, engineers can realize a variety of short-term process capabilities in good time and implement control measures efficiently against a poor long-term process capability.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call