Abstract

Dike roads include water conservancy projects and highways or public works, so the industry cross exists in designs. During the process of dike road designs, there exists problems such as disjointed dike designs and road designs, the lack of adaptation classification system and design standards, inconsistent requirements of embankment compaction and subgrade compaction, the lack of a connection with the inner road network design and green landscape design and other issues. We should fully consider the differences between dike design and road design, according to the particularity of the road dike, and we have proposed several proposals, such as increasing related indicators in the early design of the dike road design, establishing the dike road classification system, uniforming embankments and subgrade compaction standards, strengthening connections with the surrounding road network design and paying attention to greening landscape designs.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call